The 7 Steps to Going Solar

We know going solar can be complicated. We are here as your expert guide every step of the way.
With our customers, we are creating a planet run by the sun.

​

  • SITE SURVEY
  • SYSTEM DESIGN
  • PERMITTING
  • INSTALLATION
  • INSPECTIONS
  • UTILITY HOOKUP
  • POWER ON

 

1. Site Survey

An expert EngagePower Site Technician will visit to measure, review and finalize the plans we initially discussed. Just show them in and get back to your day.

 

2. Design Review

We follow up to review any tweaks or changes to our initial plan and make sure you're happy with the result.

 

3. Permitting

We'll handle the permitting and paperwork with the city. We'll let you know when everything is good to go.

 

4. Installation

Your roof gets an upgrade! The average install will take about a day, but you just need to be there to let us in.

 

5. City Inspection

Once your system is installed, we'll schedule the inspection with the city. A representative will stop by to ensure the new system is up to code.

​

6. Utility Connection

We'll work with your utility to get everything connected. The utility will connect your system to the grid and may need to install a new meter.

 

7. Power On

Flip the switch, sit back, and put the sun to work for you!

THE ENGAGE POWER GUARANTEE

Engagepower has you covered with an industry-leading solar service package. By choosing EngagePower, you are going with the best solar company in the market today. We have helped over a quarter of a million households go solar. We look forward to bringing you energy control and independence.

site survey.png
istockphoto-504384358-612x612.jpg
crowd-sourced-AHJ-permitting.jpg
Solar-Visual-Inspection-e1487507550949.jpg
house-solar-panels-design-layout-ss.jpg
solar_power_illustration.png
01.03_solar-interconnection.png
bottom of page